INDICATOR :: 1.FISH AND PRAWN PRODUCTION (METRIC TONNS)
PRODUCTION GVA Constants Rs. In Crores
Achievement during 2016-17 : 2766193 GVA for 2017-18 : 41328
Target for 2017-18 : 3384436 GVA Growth Rate : 33.32
Achievement during 2017-18 : 3449558 2018-19 Targetted GVA : 52832
% of Growth Rate of 2017-18 over previous year (2016-17) : 24.70 2018-19 GVA Growth Rate : 30.26
Target for 2018-19 : 4485200 Upto February, 2019 GVA (Constant) : 46,568
Production Growth Rate for 2018-19 : 30.02 Upto February, 2019 GVA Growth Rate : 17.35
Cumulative Achievement of previous year up to 15.03.2018 :3343628
Cumulative Achievement of current year up to 15.03.2019 :3907315
% of Growth over previous year corresponding period :16.86
District wise progress as on 15.03.2019 (Units in Metric Tons)
S.No.DistrictAchievement 2016-17 Target 2017-18Achievement 2017-18% of Growth Rate over 2016-17Target 2018-19Production Growth rate over 2017-18Cumulative Achievement of Progress from 01.04.2017 to 15.03.2018 (Previous Year) Cumulative Achievement of Progress from 01.04.2018 to 15.03.2019% of Growth rate over previous year corresponding period
1 Srikakulam8983997340982999.0015844361.189621712762432.64
2 Vizianagaram38325430684341213.0086824100.00416565069221.69
3 Visakhapatnam1545821541141558951.0022194042.3714932918720525.36
4 East Godavari25151030031230139320.0038979729.3329054838040230.93
5 West Godavari8272261050754105175427.0011500009.341014483111996710.40
6 Krishna8643891070094111063528.00125000112.551079659121430512.47
7 Guntur11722014926514968528.0021920446.4414838919186029.30
8 Prakasam9775311443111896422.0022277987.2711838913579214.70
9 Nellore28293735731836969331.0048022829.9035775443507521.61
10 Chittoor39126660668671.0059952796.6864054069-36.47
11 Kadapa40603656446610.00657841373.004437530719.61
12 Ananthapuram64508034819427.0064312684.876296732016.27
13 Kurnool2799029390304829.00115936280.34300684769758.63
 Total27,66,193.0033,84,436.0034,49,558.0024.7044,85,200.0030.0233,43,628.0039,07,315.0016.86
INDICATOR :: 2.CONVERGENCE WORKS UNDER MGNREGS PROGRESS 2018-19
District wise progress as on 22.03.2019
S.No. District Fish Ponds
Sanctioned Works In-Progress Works Completed
No. Value (in Cr) No. Value (in Cr) No. Value (in Cr)
1 Chittoor121954.050062311.140013.00000.4000
2 Kadapa46738.51001986.36001.00000.0000
3 Ananthapuram47525.24002073.840017.00000.4900
4 Nellore1477.3000761.590056.00001.7000
5 Visakhapatnam22813.23001192.970015.00000.2500
6 East Godavari713.1800270.790032.00000.3600
7 Srikakulam774.6700330.69008.00000.4600
8 Kurnool23116.29001062.450018.00000.8700
9 Vizianagaram27112.5400521.3600113.00000.2300
10 Prakasam17614.2900421.72005.00000.1900
11 Krishna16510.3000290.430078.00002.1700
12 West Godavari402.6300110.55002.00000.1600
13 Guntur725.0000250.05000.00000.0000
 Total3,639.00207.231,548.0033.94358.007.28
CONVERGENCE WORKS UNDER MGNREGS - ACTION PLAN AND PROGRESS 2018-19
District wise progress as on 22.03.2019
S.No. District Fish Drying Platforms
Sanctioned Works In-Progress Works Completed
No. Value (in Cr) No. Value (in Cr) No. Value (in Cr)
1 Chittoor30.0300.000000.0000
2 Kadapa170.5890.110040.0600
3 Ananthapuram130.2820.030010.0400
4 Nellore632.37250.420080.2800
5 Visakhapatnam672.10230.2400150.2200
6 East Godavari821.32190.1000430.4800
7 Srikakulam1474.78400.4800581.4600
8 Kurnool481.79100.030000.0000
9 Vizianagaram802.86160.2000581.5300
10 Prakasam2204.55360.2400560.7500
11 Krishna500.51110.0000120.0200
12 West Godavari170.2720.010050.0400
13 Guntur511.07270.190090.1200
 Total85822.512202.05002695.0000
CONVERGENCE WORKS UNDER MGNREGS - ACTION PLAN AND PROGRESS 2018-19
District wise progress as on 22.03.2019
S.No. District Approach Roads
Sanctioned Works In-Progress Works Completed
No. Value (in Cr) No. Value (in Cr) No. Value (in Cr)
1 Chittoor50.230010.01000.0000
2 Kadapa331.680090.11000.0000
3 Ananthapuram191.440050.11010.0000
4 Nellore161.450020.03010.0000
5 Visakhapatnam70.090060.01000.0000
6 East Godavari20712.1300871.720300.1600
7 Srikakulam906.3300160.31040.0400
8 Kurnool262.340040.02000.0000
9 Vizianagaram90.370000.00000.0000
10 Prakasam402.810030.13000.0000
11 Krishna774.8200210.24080.0100
12 West Godavari20114.7000330.36010.0000
13 Guntur201.160050.22010.0000
 Total75049.55001923.270460.2100
CONVERGENCE WORKS UNDER MGNREGS - ACTION PLAN AND PROGRESS 2018-19
District wise progress as on 22.03.2019
S.No. District Total Expenditure Rank on Total Expenditure
Wage Material Total in (Cr)
1 Chittoor11.500.0611.56I
2 Kadapa6.440.206.64II
3 Ananthapuram4.410.104.51III
4 Nellore3.290.734.02IV
5 Visakhapatnam3.220.473.69V
6 East Godavari2.291.323.61VI
7 Srikakulam1.441.993.43VII
8 Kurnool3.330.043.37VIII
9 Vizianagaram1.581.743.32IX
10 Prakasam2.031.003.03X
11 Krishna2.820.052.87XI
12 West Godavari0.960.171.13XII
13 Guntur0.100.470.57XIII
Total43.418.3451.75
Abstract (A,B,C)
S.No. Work Name Sanctioned Works In-Progress Work Completed
No. Value (in Rs. Cr) No. Value (in Rs. Cr) No. Value (in Rs. Cr)
1 Fish Ponds3639207.2300154833.94003587.2800
2 Fish Drying Platforms85822.51002202.05002695.0000
3 Approach Roads75049.55001923.2700460.2100
Total 5,247.00279.291,960.0039.26673.0012.49
INDICATOR NO::3: CONVERGENCE WORKS UNDER NEERU - PRAGATHI - PROGRESS 2018-19
District wise progress as on 22.03.2019
S.No. District No.of Works De- Silting of Creeks and Drains
Target
Work Deatails Works In-Progress Works Completed

Name of the Creek/Drain Length (in Km) Amount Sanctioned by Govt. Length (in Km) Value(in Rs Cr) Length(in Km) Value(in Rs Cr) Remarks
1 Srikakulam1Kuppili2.00005.690.000.000.000.00Water Resources Dept. accorded Administrative sanction Vide G.O RT No.91, Dt.31.01.2019, for taking up the work. Retender to be called for.
2 Visakhapatnam2Gunupudi Creek4.00000.600.000.000.000.00The Chief Engineer North Coast, Visakhapatnam District vide letter No.CE/NC/VSP/DEE2/AEE8/1/Misc Vol.64/182 Govt. Dt.26.10.2018 furnished to Water Resources Dept as per the instructions.
3 East Godavari3Teki Major Drain41.000024.656.009.633.504.40Water Resources Dept. accorded Administrative sanction Vide G.O RT No.91, Dt.31.01.2019, for taking up the work. The works are in Tender process.
4 East Godavari4Tulyabagha Major Drain10.00000.000.000.000.000.00 The Chief Engineer Godavari Delta System, Dawaleswaram, East Godavari District vide letter No.CE/GDS/DWM/SA1/196 Govt. Dt.01.11.2018 furnished check list along with suitable Heads of Account to The Secretary to Govt, Water Resources Dept as per the instructions (Vide Govt. Memo No. 414045/CADA.1/2017, dated 10-10-2018)
5 East Godavari5Lower Kousika Major Drain17.00000.000.000.000.000.00
6 East Godavari6Vasala Tippa Major Drain20.40000.000.000.000.000.00
7 East Godavari7Palagummi Minor Drain20.00000.000.000.000.000.00
8 East Godavari District Total108.400024.656.009.633.504.40 
9 West Godavari8Gonteru51.760077.6415.0013.930.000.00Work is in progress
10 West Godavari9Desilting of Yanamadhuru Drain.9.000080.480.000.000.000.00Water Resource Department issued sanction order to execute works. Works under progress.
11 West Godavari10Desilting of Upputeru Straightcut at sea mouth108.400012.300.000.000.000.00 The Chief Engineers Godavari Delta System, Dawaleswaram, East Godavari District vide letter No.CE/GDS/DWM/SA1/196 Govt. Dt.01.11.2018 furnished check list along with suitable Heads of Account to The Secretary to Govt, Water Resources Dept as per the instructions (Vide Govt. Memo No. 414045/CADA.1/2017, dated 10-10-2018)
12 West Godavari11Gostani Major Drain8.00001.750.000.000.000.00
13 West Godavari12Bhaggeswaram Major Drain24.20003.250.000.000.000.00
14 West Godavari13Basavarjau Codu Major Drain10.40008.500.000.000.000.00
15 West Godavari14Mogalthuru Major Drain24.60003.000.000.000.000.00
16 West Godavari District Total236.4000186.9215.0013.930.000.00 
17 Krishna15Pedda Lanka Drain17.000024.050.000.000.000.00Water Resources Dept. accorded Administrative sanction Vide G.O RT No.91, Dt.31.01.2019, for taking up the work. The works are in Tender process.
18 Krishna16Desilting in non notified drains65.00000.6512.000.1053.000.55Desilting in non notified drains Work Completed in 53 Kms. As a result, Culture area of 1618 ha benefited and expected productivity enhancement is 810 tonnes.
19 Krishna District Total82.000024.7012.000.1053.000.55 
20 Guntur17Gondi Samudram4.50002.750.000.000.000.00Water Resources Dept. accorded Administrative sanction Vide G.O RT No.91, Dt.31.01.2019, for taking up the work. E-tenders called for.
21 Prakasam18Paleru7.800045.920.000.000.000.00Water Resources Dept. accorded Administrative sanction Vide G.O RT No.91, Dt.31.01.2019, for taking up the work. The Works are in Tender Process.
22 Nellore19Chppaleru at Thatichetlapalem16.00001.180.000.000.000.00Water Resources Dept. accorded Administrative sanction Vide G.O RT No.91, Dt.31.01.2019, for taking up the work. The Works are in Tender Process.
23 Nellore20Chppaleru at Isakapalli 3.780.000.000.000.00
24 Nellore21Pyderu 0.900.000.000.000.00
25 Nellore22Pennar Backwater at utkur 0.950.000.000.000.00
26 Nellore23B.Canal 1.870.000.000.000.00
27 Nellore24Koduru Creek (B.Canal) 0.260.000.000.000.00
28 Nellore25Pennar Backwater at Gangapatnampallipalem 0.380.000.000.000.00
29 Nellore26Kandaleru Creek at Edagali 0.200.000.000.000.00
30 Nellore27Kandaleru Creek at Kolanukoduru 0.280.000.000.000.00
31 Nellore28Kandaleru Creek at Pudiparthi 0.070.000.000.000.00
32 Nellore29Kandaleru Creek at Epur Venkannapalem 0.180.000.000.000.00
33 Nellore30B. Canal at Kondurupalem 0.390.000.000.000.00
34 Nellore31B. Canal at Chinaramudupalem 8.030.000.000.000.00
35 Nellore District Total16.000018.460.000.000.000.00 
 Grand Total461.0600309.6933.0023.6656.504.95
INDICATOR :: 4.STATUS OF AREA EXPANSION AND PENDING REGISTRATIONS ON AQUA PONDS
Target (2017-18) : Area Expansion : 21947 - ha Achievement (2017-18) : 33308 -ha
Target (2017-18) : Pending Registrations of Aqua ponds : 199008 - ha Achievement (2017-18) : 135445 -ha
Target (2018-19) : Area Expansion : 16000 - ha Achievement (2018-19): 5185.50 -ha
Target (2018-19) : Pending Registrations of Aqua ponds: 65422.82 65422.82 - ha Achievement (2018-19) : 11635.23 -ha
District wise progress as on 22.03.2019
INDICATOR :: 4.STATUS OF AREA EXPANSION AND PENDING REGISTRATIONS ON AQUA PONDS
Target (2017-18) : Area Expansion : 21947 - ha Achievement (2017-18) : 33308 -ha
Target (2017-18) : Pending Registrations of Aqua ponds : 199008 - ha Achievement (2017-18) : 135445 -ha
Target (2018-19) : Area Expansion : 16000 - ha Achievement (2018-19): 5068.10 -ha
Target (2018-19) : Pending Registrations of Aqua ponds: 65305.42 - ha Achievement (2018-19) : 11619.49 -ha
District wise progress as on 22.03.2019
S.No. District Area Expansion (in ha.) Pending Registration of Aqua ponds (in ha.)
Annual Target Achievement upto 15.03.2019 Achievement from 16.02.2019 to 22.03.2019 Cumulative Achievement as on 22.03.2019 Annual Target Cummulative Target as on 22.03.2019 Achievement upto 15.03.2019 Achievement from 16.02.2019 to 22.03.2019 Cummulative Achievement as on 22.03.2019
1 Srikakulam1000.00465.000.00465.00887.01852.89335.000.00335.00
2 Vizianagaram50.0059.430.0059.4376.7473.7917.000.0017.00
3 Visakhapatnam150.00161.080.00161.08393.57378.43108.050.00108.05
4 East Godavari1950.002033.500.002033.506192.505954.332407.460.002407.46
5 West Godavari3100.0035.180.0035.1815666.5915064.031318.008.001326.00
6 Krishna3550.00842.10106.40948.5029490.1928355.956465.997.746473.73
7 Guntur1200.00183.810.00183.816827.716565.11289.000.00289.00
8 Prakasam2500.00195.000.00195.002400.112307.8085.000.0085.00
9 Nellore2500.001093.0011.001104.003488.403354.23594.000.00594.00
 Total16,000.005,068.10117.405,185.5065,422.8262,906.5611,619.4915.7411,635.23
INDICATOR :: 5.INSPECTIONS OF HATCHERIES AND AQUA SHOPS
Target (2017-18): Hatchery Inspections : 325 - Nos Achievement (2017-18) : 828 - Nos
Target (2017-18): Aqua Shops Inspections : 874 - Nos Achievement (2017-18) : 1388 - Nos
Target (2018-19): Hatchery Inspections : 1300 - Nos Achievement (2018-19) : 740 - Nos
Target ( 2018-19) : Aqua Shops Inspections : 3496 - Nos Achievement (2018-19) : 1510 - Nos
District wise progress as on 22.03.2019
S.No. District Target for Hatchery Inspections (Nos.) Inspection of Aqua shops (Nos.)
No.of Hatcheries Annual Target Cummulative Target up to 22.03.2019 Achievement upto 15.03.2019 Achievement from 16.03.2019 to 22.03.2019 Cummulative Achievement as on 22.03.2019 No.of Aqua Shops Annual Target Cummulative Target up to 22.03.2019 Achievement upto 15.03.2019 Achievement from 16.03.2019 to 22.03.2019 Cummulative Achievement as on 22.03.2019
1 Srikakulam288190197282744044
2 Vizianagaram10403827027000000
3 Visakhapatnam351401359911004161531031
4 East Godavari14859256926552701405605382860286
5 West Godavari6242349049333133212814464450
6 Krishna72827310311787126853630363
7 Guntur124846260264718818167067
8 Prakasam321281231271128652602501381139
9 Nellore73292281900901004003851300130
Total325.001,300.001,250.00733.007.00740.00874.003,496.003,362.001,505.005.001,510.00

Note:

Minimum two times each hatchery & Aqua shop shall be inspected by the District Level Task Force Team in a year.

EXTENSION SERVICES
Target (2017-18) for CARK : 181
Target (2017-18) for Aqua Lab Services : 40000 Achievement : 38152
Target (2017-18) for Training to Inland Fishers : 110000 Achievement : 107028
S.No. District CARK (Chandranna Aqua Rythu Kshetraalu) Aqua Lab Services Capacity Building Training to Fishers/Aqua Farmers Attended
Target Cum Ach Target Cum Ach Target Cum Ach Target Cum Ach
1 Srikakulam1212500633994538920A
2 Vizianagaram22001885525382412A
3 Visakhapatnam5528004325703768912A
4 East Godavari38341550021461383518622272A
5 West Godavari2926102005101535220671671
6 Krishna252580008493309944564516A
7 Guntur20173001846240840930A
8 Prakasam131320003154805647450A
9 Nellore374090016651456931010A
10 Chittoor00006168393A
11 Kadapa000066389124A
12 Ananthapur00001617218205A
13 Kurnool00002024272184A
 Total1811744020046651119481507115699A
STATUS OF USE OF BIOMETRIC ATTENDANCE & E-OFFICE
S.No. District BIO-METRIC ATTENDANCE E-OFFICE IMPLEMENTATION
No. of Employees Enrolled Number Attended % Attended Grading on Bio-Metric Total no.of Files Processed No.of Files Processed in e-office mode % Processed in e-office mode Grading on E-office
1 Srikakulam4747100A1111100A
2 Vizianagram2727100A361028C
3 Visakhapatnam6464100A2323100A
4 East Godavari7777100A451022C
5 West Godavari5454100A3232100A
6 Krishna9999100A104104100A
7 Guntur5050100A751723C
8 Prakasam4646100A6262100A
9 Nellore626198A201890A
10 Chittoor3838100A11655B
11 Kadapa2525100A1919100A
12 Ananthapur302893A171694A
13 Kurnool452760B142100
 Total66464396.23A187632870.15
INDICATOR :: 6.FISH SEED (Spawn) REARING FOR STOCKING POTENTIAL INLAND PUBLIC WATER BODIES
Seasonal Activity From July to August
S.No. District Total Target Achivement upto 26.10.2018 Achivement from 27.10.2018 to 02.11.2018 Cummulative Achivement upto 02.11.2018
Total
Target (Qty in Cr) Achiv (Qty in Cr) Target (Qty in Cr) Achiv (Qty in Cr) Target (Qty in Cr) Achiv (Qty in Cr)
1 Srikakulam89839.0097340.0098299.009.00158443.0061.1841095.00
2 Vizianagaram38325.0043068.0043412.0013.0086824.00100.0017780.00
3 Visakhapatnam154582.00154114.00155895.001.00221940.0042.3763017.00
4 East Godavari251510.00300312.00301393.0020.00389797.0029.33125224.00
5 West Godavari827226.001050754.001051754.0027.001150000.009.34628027.00
6 Krishna864389.001070094.001110635.0028.001250001.0012.55615038.00
7 Guntur117220.00149265.00149685.0028.00219204.0046.4470104.00
8 Prakasam97753.00114431.00118964.0022.00222779.0087.2764557.00
9 Nellore282937.00357318.00369693.0031.00480228.0029.90191404.00
10 Chittoor3912.006660.006686.0071.0059952.00796.681912.00
11 Kadapa4060.003656.004466.0010.0065784.001373.002056.00
12 Ananthapuram6450.008034.008194.0027.0064312.00684.872247.00
13 Kurnool27990.0029390.0030482.009.00115936.00280.3410200.00
14 Total4170904.005123284.005248363.0024.706963396.0032.682790173.00
 Total6937097.008507720.008697921.00320.7011448596.003585.954622834.00
INDICATOR :: 6.STATEMENT SHOWING THE DISTRICT WISE FISH FINGERLINGS STOCKING PROGRAMME FOR THE YEAR 2018-19 AS ON 28.12.2018 IN ITDA AND DEPARTMENT TANKS
S.No. District Total No.of Tanks in the District No.of Tanks Received Water EWSA in Ha. No.of Fingerlings Stocked up to 21.12.2018 No.of Fingerlings Stocked during 22.12.2018 to 28.12.2018 Cummulative Stocking as 28.12.2018
No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs)
1 Srikakulam3854368328433.981885275.00367.671921282.67
2 Vizianagaram249123289641.731810166.4500.001810166.45
3 Visakhapatnam150311889521.621012157.2600.001012157.26
4 East Godavari1774161710348.001818232.74323.121850235.86
5 West Godavari1236123610321.971129197.0010727.751236224.75
6 Krishna233713905.005766.1800.005766.18
7 Guntur2376127922.0061155.7400.0061155.74
8 Prakasam906182899.00325.17015.68340.85
9 Nellore4262034301.481158.18115.301273.48
10 Chittoor80631012335.994325.3900.004325.39
11 Kadapa241148952.001069.0517.981177.03
12 Ananthapuram12917810101.4953105.17414.7057119.87
13 Kurnool18511233654.7124119.8700.0024119.87
Total2244010527192338.9779161653.1918192.2080971745.39

Details Of Fingerlings StockingTotal No.Of Tanks (No)EWSA (Ha)No.Of Tanks Stocked (No)Fingerlings Stocked (In Lakhs)
1. Fingerlings Stocked in ITDA13489692.681207108.22
2. Fingerlings in Outside ITDA21092182646.2968901637.17
Total22440192338.9780971745.39
INDICATOR :: 6.A STATEMENT SHOWING THE DISTRICT WISE FISH FINGERLINGS STOCKING PROGRAMMEFOR THE YEAR 2018-19 AS ON 28.11.2018 IN ITDA TANKS
S.No. District Total No.of Tanks in the District No.of Tanks Received Water EWSA in Ha. No.of Fingerlings Stocked up to 16.11.2018 No.of Fingerlings Stocked during 17.11.2018 to 23.11.2018 Cummulative Stocking as 23.11.2018 Balance to be Stocked
No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs)
1 Srikakulam5735731277.9839715.4900.0039715.4917618.22
2 Vizianagaram3353353589.735810.6900.005810.6927751.00
3 Visakhapatnam206206818.6220613.3200.0020613.3200.00
4 East Godavari67671098.0033310.3273.3034013.6200.00
5 West Godavari83832608.873224.6000.003224.605120.02
6 Krishna000.0000.0000.0000.0000.00
7 Guntur700.0000.0000.0000.0000.00
8 Prakasam2217.0000.0000.0000.0020.43
9 Nellore6811915.5400.0000.0000.0011.50
10 Chittoor000.0000.0000.0000.0000.00
11 Kadapa000.0000.0000.0000.0000.00
12 Ananthapuram000.0000.0000.0000.0000.00
13 Kurnool7765.0000.0000.0000.0071.63
Total1348127411390.74102674.4273.30103377.7251492.79
INDICATOR :: 6.B STATEMENT SHOWING THE DISTRICT WISE FISH FINGERLINGS STOCKING PROGRAMME FOR THE YEAR 2018-19 AS ON 23.11.2018 IN ITDA AND DEPARTMENT TANKS
S.No. District Total No.of Tanks in the District No.of Tanks Received Water EWSA in Ha. No.of Fingerlings Stocked up to 16.11.2018 No.of Fingerlings Stocked during 17.11.2018 to 23.11.2018 Cummulative Stocking as 23.11.2018 Balance to be Stocked
No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs) No.of Tanks Fingerlings (in lakhs)
1 Srikakulam3281308126772.001350247.5100.001350247.511731278.49
2 Vizianagaram215619936052.001752155.7600.001752155.7624169.20
3 Visakhapatnam12979828703.00806143.9400.00806143.941762.40
4 East Godavari170715509250.001426205.84276.561453212.40973.61
5 West Godavari115311537713.101097162.8709.531097172.405610.12
6 Krishna233713905.002651.5000.002651.504527.15
7 Guntur2304727268.0019115.8900.0019115.8947124.12
8 Prakasam904152707.0034.3000.0034.301236.55
9 Nellore358741672.60432.6324.80637.43152.57
10 Chittoor80631012335.991710.952614.454325.395830.56
11 Kadapa241148952.001060.4000.001060.40439.60
12 Ananthapuram12917810101.493880.9365.544486.473419.01
13 Kurnool17810533589.71463.0000.00463.00101317.67
Total210929197189021.8965521335.516140.8766131376.3826031011.05
INDICATOR :: 4.STATUS OF AREA EXPANSION AND PENDING REGISTRATIONS ON AQUA PONDS
Target (2017-18) : Area Expansion : 21947 - ha Achievement (2017-18) : 33308 -ha
Target (2017-18) : Pending Registrations of Aqua ponds : 199008 - ha Achievement (2017-18) : 135445 -ha
Target (2018-19) : Area Expansion : 16000 - ha Achievement (2018-19): 4575.98 -ha
Target (2018-19) : Pending Registrations of Aqua ponds:65010.89 -ha Achievement (2018-19) : 11418.08 -ha